Organized project files prepared for handoff

Insight

Your Revit Hire Starts Next Month. What Can Leave Your Desk Today?

Split a temporary staffing gap into work an outside drafter can start now and decisions your incoming architect should inherit.

Organized project files prepared for handoff

Practical guide

What this article covers

Split a temporary staffing gap into work an outside drafter can start now and decisions your incoming architect should inherit.

A new hire is on the way. Unfortunately, the next drawing review is already on the calendar. Sending the entire model out creates a second onboarding problem; waiting for the new person means their first week starts with overdue work. Treat the gap as a short assignment with an end date, not as a smaller version of the permanent role.

Separate approved work from unfinished decisions

Take the current issue list and mark each line “draw,” “decide,” or “verify.” Updating approved room names is a draw task. Choosing which entrance moves is a design decision. Checking whether an old survey matches the model is verification; someone must own the answer before the result gets drawn as fact.

Give the outside team a batch of draw tasks with one named reviewer. Keep the decision list with the project architect. Only release verification tasks when the team knows what evidence counts and where to record a discrepancy.

Pick a boundary the new hire can understand

“Help with CDs for two weeks” is difficult to hand back. “Update the Level 2 enlarged plans against markup set B; flag door schedule impacts without editing the schedule” gives both teams an edge they can see. List the sheet numbers, the working model version and who may sync changes. Agree on a first plotted sheet before the rest of the batch moves.

Write the exit note before the work starts

Set up a one-page handover with four headings: completed sheets, source file location, open questions and items deliberately left untouched. Fill the last heading on day one. A new employee should not have to infer from a clean drawing whether the existing door schedule was checked.

For example: “Level 2 plans updated against B. Two room numbers await PM confirmation. Door schedule review excluded. Check PDFs are in the issued review folder.” That note is more useful on Monday morning than a long record of chat messages.

Keep the bridge temporary unless the workload repeats

Finish the assignment when the defined sheets are back. If another clear batch appears every week, that is a separate conversation about monthly production support. If it was simply an awkward gap between issue dates, a single defined project has done its job.